University of California San Francisco (UCSF)

During the design phase of UCSF’s 654 Minnesota Street Project, UCSF had concerns about the overall quality of Indoor Air, as the location of the project was adjacent to Interstate 280, an eight (8) lane freeway. The main concern was the possibility of vehicle exhaust fumes entering the outside air intake of the 42,500 CFM Roof Top mounted air handler. In addition, there were also concerns about emissions from the emergency diesel generator that was positioned adjacent to the building…

Download Full Case Study